Start Date: March 2013
End Date: August 2013
Location: Solon, Iowa
Size: 56’x56’x10 – 68’x34’x12′ – 56’x40’x10′
Special Features:
• Stone entryway and wainscot
• Annexed entryway
• Engineered wood siding
• Gymnasium
• Full commercial kitchen

 

 

This facility was started at the tail end of winter with feet of frost in the ground with a very tight deadline to open August 15. Our Lester Building package with engineered posts in drilled into the ground allowed this deadline to be realized. This building houses over 100 children from infants to preschool aged as well as an after school program. Each age group has its own classroom as well as restroom facilities. There’s also a shared gymnasium, commercial kitchen and outside playground. We worked directly with our architect, the State of Iowa and our customer to design the facility and general contracted the entire project for the customer.